Project 240sx Overhaul Journal (Day 20)
Jul 15, 2008 Project 240sx Overhaul Journal, Project MR2 Spyder (DD), Uncategorized
Related Links
Today, the new turbo manifold was modified and installed and then a rough charge pipe was created for testing purposes. Also note the compressor blade on the turbo. This close picture is going to be used as a before image to test the wear on the wheel for pre turbo water injection.
- The collector is braced to the base of runners 2 and 3. All welds were made with a mig welder using steel wire. This works fine on stainless steel but does result in a little bit of spatter and an uglier weld.
- A thick weld is placed between runners 1 and 2 as well as 3 and 4.
- The turbo flange is then braced to runners 2 and 3.
- This opening was then plugged.
- Here is a close up of the mint condition compressor wheel. This will be used to determine if injecting water pre turbo damages the wheel.
- A mock up of the short charge pipe. The finished product will be cleaner and sport a SSQV blow off valve.





