Project 240sx Overhaul Journal (Day 21)
Jul 21, 2008 Project 240sx Overhaul Journal
Related Links
Day 21: A smoother charge pipe was created that includes the SSQV BOV. The inside was also sandblasted and smoothed to ensure maximum airflow.
- The completed charge pipe for the new setup. I created a smooth transition and added the BOV flange and idle air nipple.
- The new charge pipe installed on top of the CA18DET.
- The SSQV BOV installed on the new pipe.


